EN1090 certified product range:
1.In buildings and civil engineering: building materials, components, systems, etc;
2.Prefabrication system: house, garage, tower (wind energy equipment, etc.), derrick, etc;
3.Structural steel, aluminum structures and kits;
4.Composite steel and concrete structural steel parts;
5.The above components can be used directly or in building work, or as structural components of the kit;
6.The above components can be made of hot rolled, cold formed or other components produced by other technologies;
7.It can be made of various shapes of steel and aluminum cross sections/profiles, parallel products (plates, plates, bars), bars, forgings, castings.
Basic requirements for factory production control:
- Personnel compliance
- Equipment compliance
- Structural design compliance
- Conformity of components
- Component Specification Compliance
- Process control compliance
- Conformity of nonconformity control
- Document control compliance
Initial type inspection:
- Dimensional and form tolerances
- Weldability
- Fracture toughness and impact resistance
- Load carrying capacity, fatigue strength
- Deformation at serviceability limit state
- Flame retardant, fire reaction
- Hazardous substances
- Durability
EN1090 certification points:
EN1090 certification is an audit of steel structure enterprise system. Mainly assess the quality control ability of the enterprise. It mainly includes: qualification of welding personnel, material certificate, quality control documents, establishment of welding system, and product testing.
The main points to be certified in general are as follows:
a.Establish the factory production control system FPC; Refer to EN 1090-1, 6.3, P19;
b.Select the execution level EX1~4; Refer to EN 1090-2, A.3, P 107;
c.Verification of material certificate; Refer to EN 1090-2, 5, P25,
d.Establish welding system; Refer to EN 1090-1, Table B.1, P26;
e.Determination of product performance parameters; Refer to EN 1090-1, ZA 1, P30;
f. Sign the declaration of conformity and use the CE label.
Standard composition of EN1090
EN1090 is the standard for steel structures under the building materials regulation CPR. This standard has been implemented since 01/09/2012 and has three parts:
EN 1090-1:2009+A1:2011
Steel and aluminium structures - Part 1: Basic requirements for conformity assessment of structural components
EN 1090-2: 2008
Steel and aluminum structures - Part II: Technical requirements for steel structures
EN 1090-3: 2008
Steel and aluminum structures - Part 3: Technical requirements for aluminum structures
Key points of FPC audit:
1.General requirements
Establish a factory management and control system based on the requirements of ISO9001 documents to ensure that the products put on the market are consistent with the performance parameters declared by the manufacturer FPC system shall include procedure documents, inspection procedures, product testing, sampling and verification records. Inspection results are used to control product quality, production process documents and production flow chart.
2.personnel
Welder certificate and welding operator certificate conforming to EU standards.
3.equipment
Measurement and calibration of weighing equipment, inspection equipment and test equipment. Control of procedure documents.
4.Structure design process
Evaluation of design calculations, evaluation of compliance with European standards
5.Constituent materials (raw materials)
Material certificate or material document, such as 3.1 certificate, 2.2 document (inside the factory) or 3.2 certificate issued by a third party.
6.Material specification
Provide basic performance requirements, basic performance verification and record.
7.Final product inspection
8.Nonconforming Product Handling Process
9.The factory provides the initial type testing report, which can be executed by the factory itself or by a third-party laboratory.
10. Welding system qualification certificate includes welding procedure (WPQR/WPAR), base metal, executive grade and standard. Provide welder manual, etc.
EN1090 certification process:
1.The enterprise applies to the certification authority and provides factory information
2.The certification authority shall evaluate and provide detailed certification scheme and work arrangement
3.The certification authority arranges steel structure engineers to carry out standard training and coaching in the enterprise, so as to facilitate the smooth progress of later work
4.The enterprise shall submit the factory and product information according to the requirements of the certification authority, and make rectification according to the rectification report given by Eurotest
5.The enterprise arranges relevant welding personnel to participate in the training and assessment of welding personnel; If the factory does not have a qualified material certificate, the organization will help to test and issue it;
6.Conduct product testing
7.The certification authority shall arrange auditors to conduct on-site audit and issue audit report
8.After passing the review, the certification authority shall submit technical documents and relevant certificates to the issuing authority, and the issuing authority shall review, file and issue certificates
9.The certification authority guides enterprises to paste the marks.
Shanghai Jiyi is one of the CE notified bodies of EU member states. It can issue EN1090 steel structure certification and other certificates to provide one-stop services for the export of enterprises' products, eliminating intermediate links and providing more efficient services for enterprises. For details, please consult our technical engineers.
EN1090 certified product range:
1.In buildings and civil engineering: building materials, components, systems, etc;
2.Prefabrication system: house, garage, tower (wind energy equipment, etc.), derrick, etc;
3.Structural steel, aluminum structures and kits;
4.Composite steel and concrete structural steel parts;
5.The above components can be used directly or in building work, or as structural components of the kit;
6.The above components can be made of hot rolled, cold formed or other components produced by other technologies;
7.It can be made of various shapes of steel and aluminum cross sections/profiles, parallel products (plates, plates, bars), bars, forgings, castings.
Basic requirements for factory production control:
- Personnel compliance
- Equipment compliance
- Structural design compliance
- Conformity of components
- Component Specification Compliance
- Process control compliance
- Conformity of nonconformity control
- Document control compliance
Initial type inspection:
- Dimensional and form tolerances
- Weldability
- Fracture toughness and impact resistance
- Load carrying capacity, fatigue strength
- Deformation at serviceability limit state
- Flame retardant, fire reaction
- Hazardous substances
- Durability
EN1090 certification points:
EN1090 certification is an audit of steel structure enterprise system. Mainly assess the quality control ability of the enterprise. It mainly includes: qualification of welding personnel, material certificate, quality control documents, establishment of welding system, and product testing.
The main points to be certified in general are as follows:
a.Establish the factory production control system FPC; Refer to EN 1090-1, 6.3, P19;
b.Select the execution level EX1~4; Refer to EN 1090-2, A.3, P 107;
c.Verification of material certificate; Refer to EN 1090-2, 5, P25,
d.Establish welding system; Refer to EN 1090-1, Table B.1, P26;
e.Determination of product performance parameters; Refer to EN 1090-1, ZA 1, P30;
f. Sign the declaration of conformity and use the CE label.
Standard composition of EN1090
EN1090 is the standard for steel structures under the building materials regulation CPR. This standard has been implemented since 01/09/2012 and has three parts:
EN 1090-1:2009+A1:2011
Steel and aluminium structures - Part 1: Basic requirements for conformity assessment of structural components
EN 1090-2: 2008
Steel and aluminum structures - Part II: Technical requirements for steel structures
EN 1090-3: 2008
Steel and aluminum structures - Part 3: Technical requirements for aluminum structures
Key points of FPC audit:
1.General requirements
Establish a factory management and control system based on the requirements of ISO9001 documents to ensure that the products put on the market are consistent with the performance parameters declared by the manufacturer FPC system shall include procedure documents, inspection procedures, product testing, sampling and verification records. Inspection results are used to control product quality, production process documents and production flow chart.
2.personnel
Welder certificate and welding operator certificate conforming to EU standards.
3.equipment
Measurement and calibration of weighing equipment, inspection equipment and test equipment. Control of procedure documents.
4.Structure design process
Evaluation of design calculations, evaluation of compliance with European standards
5.Constituent materials (raw materials)
Material certificate or material document, such as 3.1 certificate, 2.2 document (inside the factory) or 3.2 certificate issued by a third party.
6.Material specification
Provide basic performance requirements, basic performance verification and record.
7.Final product inspection
8.Nonconforming Product Handling Process
9.The factory provides the initial type testing report, which can be executed by the factory itself or by a third-party laboratory.
10. Welding system qualification certificate includes welding procedure (WPQR/WPAR), base metal, executive grade and standard. Provide welder manual, etc.
EN1090 certification process:
1.The enterprise applies to the certification authority and provides factory information
2.The certification authority shall evaluate and provide detailed certification scheme and work arrangement
3.The certification authority arranges steel structure engineers to carry out standard training and coaching in the enterprise, so as to facilitate the smooth progress of later work
4.The enterprise shall submit the factory and product information according to the requirements of the certification authority, and make rectification according to the rectification report given by Eurotest
5.The enterprise arranges relevant welding personnel to participate in the training and assessment of welding personnel; If the factory does not have a qualified material certificate, the organization will help to test and issue it;
6.Conduct product testing
7.The certification authority shall arrange auditors to conduct on-site audit and issue audit report
8.After passing the review, the certification authority shall submit technical documents and relevant certificates to the issuing authority, and the issuing authority shall review, file and issue certificates
9.The certification authority guides enterprises to paste the marks.
Shanghai Jiyi is one of the CE notified bodies of EU member states. It can issue EN1090 steel structure certification and other certificates to provide one-stop services for the export of enterprises' products, eliminating intermediate links and providing more efficient services for enterprises. For details, please consult our technical engineers.